The paper is focused on broader considerations regarding the commissioning process of the 3rd Unit of nuclear power plant VVER-440 type in Mochovce (Slovakia). The new nuclear plant built in Europe is getting much more slowly than expected, declared or scheduled. Besides the nuclear power plant in Olkiluoto (Finland) and also Flamanville (France), the 3rd Mochovce Unit has finally been in full operation since 6 November 2024. Nevertheless, the more than 30 years of construction process, which was intermittently stopped and frozen, make this success story exceptional. Lessons learned from commissioning are every time specific for different countries but commissioning of nuclear power plant without presence of general designer, respecting all safety requirements and taking full responsibility for this process is unique. Still, in general, the actual Slovak experiences and knowledge could help optimise new buildings in Europe, including dreams about small modular reactor deployment or the building of other clean and sustainable use of advanced nuclear facilities in the future.
Slugeň et al. (Thu,) studied this question.