The European Union aims to cut greenhouse gas emissions by 55% by 2030 and reach climate neutrality by 2050, targets that depend on expanding renewable generation in the European energy system. While photovoltaic (PV) capacity has grown quickly in several member states, others remain far behind. This paper frames that divergence as a systems planning problem: installed MW expands through diffusion-like dynamics, but the conversion of investment into energizable capacity is filtered by grid-integration constraints and institutional throughput. The study develops a macro-level framework for systems-level assessment and decision support to guide PV capacity planning and budget allocation using official 2012–2022 data for 22 EU countries. We combine (i) unsupervised clustering of standardized national deployment trajectories, (ii) bounded logistic fits interpreted as an operational diffusion-with-saturation representation that yield comparable growth parameters and maturity years (80–90% of the estimated ceiling), and (iii) a proportional reallocation scenario for countries below 5 GW in 2022. Three clusters emerge—steady growth, early plateau, and atypical paths—and an analytically tractable maturity indicator integrates capacity, rate, and timing in a single measure. In a 10 GW reallocation scenario, average progress toward the 5 GW benchmark rises from 9.8% to 23.1%, closing about 14.8% of the aggregate shortfall. The allocation experiment reveals a clear asymmetry: systems with an existing installed base convert additional MW into benchmark progress more efficiently than very low-baseline systems, where binding constraints are more likely to sit in permitting, interconnection queues, and hosting capacity rather than in finance alone. Turning these allocations into usable capacity depends on timely interconnection and power-electronics integration and on grid-enablement constraints such as interconnection readiness, inverter compliance, and local hosting capacity in high-penetration areas. The contribution is a transparent, updateable decision-support pipeline that links observed trajectory regimes to a maturity “clock” and an auditable allocation baseline, making the trade-off between closing capacity gaps and respecting feasibility filters explicit in an EU system with heterogeneous national subsystems. The proposed approach links macro-level maturity clusters to operational feasibility signals in the grid integration layer, showing that modeling-based allocation can improve system progress but cannot substitute grid-enablement measures, highlighting the importance of regional coordination in the EU energy system under heterogeneous national trajectories.
Tudor et al. (Tue,) studied this question.