Início
Explorar
nav.journalClub
Tendências
Mais
synapse
⌘+K
Idioma
Português
Construction of artificial water conduit by pulse hydraulic fracturing for water pre-drainage in roof fissured sandstone aquifer | Synapse
March 3, 2026
Construction of artificial water conduit by pulse hydraulic fracturing for water pre-drainage in roof fissured sandstone aquifer
XZ
Xinglong Zhao
BH
Bingxiang Huang
ZW
Zhipeng Wei
See all
Key Points
Construction of an artificial water conduit enhanced water pre-drainage efficiency and flow rates.
Pulse hydraulic fracturing was utilized, leading to significant improvements in aquifer management.
Assessment focused on roof fissured sandstone aquifers, targeting optimal water extraction methods.
Findings imply that this innovative approach may enable better resource management in hydraulic engineering applications.
Mark Helpful
Like
Save
Bookmark
Relay
Share
Cite This Study
Copy
Zhao et al. (Fri,) studied this question.
synapsesocial.com/papers/69a75efbc6e9836116a2a097
https://doi.org/https://doi.org/10.1007/s10064-025-04754-6
Mark Helpful
Like
Save
Bookmark
Relay
Share