Calculations of surface areas and ratios of minimum houses: the case of the murcian barracks = Cálculos de superficies y ratios de casas mínimas: el caso de la barraca murciana

Ask AI
Bookmark
Share

Authors

PRPedro Pina RuizTLTomás Gil López

Discussion

Loading...

Member takes

Overview

Quantitative analysis shows GIS reduces cost overruns and delays in urban construction projects, suggesting greater efficiency.

Key Points

  • Cost overruns decreased from 8.82% to 0.54% with GIS implementation, demonstrating significant financial efficiency.
  • Average project delays reduced from 15.54% to 7.14%, highlighting improved time management in construction.
  • The approach utilized a pre-experimental design, analyzing five comparable multifamily building projects with GIS.
  • High compliance levels (over 90%) indicate the operational viability and acceptance of the integrated management system.

Cite This Study

Ruiz et al. (2024) studied this question.

synapsesocial.com/papers/69a76174c6e9836116a2f702