PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
March 25, 2026Procedia Computer Science0 citationsOpen Access

Energy aware scheduling via tree-based search algorithms: A case study on lead plate curing

View Full Paper
SHStefan HabringerFHFlorian HolzingerBWBernhard Werth

Key Points

  • The aim is to develop a scheduling methodology that incorporates energy consumption for optimizing lead-acid plate production.
  • Modeling the production process as a scheduling problem
  • Applying tree-based search algorithms including uninformed and informed strategies
  • Employing single- and multi-objective optimization with energy and time as metrics
  • Conducting experiments on a constructed problem instance to test the effectiveness of the strategies
  • Proposed methods achieved schedules that optimized processing time and energy consumption
  • Demonstrated capability to balance competing objectives in scheduling
  • Results indicate practical applicability for reducing production costs in industrial settings

Abstract

Energy consumption represents a significant part of production costs for many industrial processes. To ensure practical relevance, scheduling approaches must be capable of incorporating energy-related effects in their solutions. This paper models the energy-intensive production of lead-acid plates for batteries as a real-world scheduling problem. It further proposes a methodology that applies tree-based search algorithms to solve it. The described approach explicitly includes energy-related metrics in its optimization strategy. Both single- and multi-objective optimization strategies are employed, using processing time and energy consumption as evaluation metrics. The tree-based search strategies used include uninformed and informed strategies, such as beam and piloted-beam search. Experimental results on a constructed problem instance demonstrate that the proposed methods are capable of producing schedules that optimize both processing time and energy consumption. The approach allows balancing competing objectives, making it suitable for industrial settings where energy consumption represents a major cost factor.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Habringer et al. (2026) studied this question.

synapsesocial.com/papers/69c37b41b34aaaeb1a67d71bhttps://doi.org/10.1016/j.procs.2026.02.137
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Dynamic transport-lot assignment for the hot-storage area2024 · 1 citations
  2. 2Partially Informed Depth-First Search for the Job Shop Problem2010 · 9 citations
  3. 3An Improved Scheduling Approach for Minimizing Total Energy Consumption and Makespan in a Flexible Job Shop Environment2018 · 54 citations
  4. 4Energy-aware job scheduling in a multi-objective production environment – An integrated DEA-OWA model2022 · 39 citations
  5. 5Job shop scheduling with beam search1999 · 190 citations