PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
January 22, 2026JACOW0 citationsOpen Access

The Role of Beam Diagnostics during APS-U Commissioning

View Full Paper
WCWeixing Cheng

Key Points

  • The aim is to evaluate the role of beam diagnostics in the commissioning and operation of the APS-U.
  • Assessment of various diagnostic systems used during the commissioning phase.
  • Analysis of key measurements including beam current, lifetime, and stability.
  • Focus on the functionality of beam position monitors in the storage ring.
  • APS-U successfully achieved a design beam current of 200 mA.
  • Diagnostic systems significantly contributed to reliable operations for user experiments.
  • Evaluations of beam measurements indicated positive outcomes related to beam stability and inject bunch motion.

Abstract

The Advanced Photon Source Upgrade (APS-U) represents the latest advancement in ultra-low emittance storage ring light sources. Since its commissioning and the commencement of user operations in 2024, APS-U has successfully reached its design beam current of 200 mA and operates reliably for user experiments. The diagnostic systems have been integral to the successful commissioning and operation of the machine. This paper presents the beam commissioning results of various diagnostic systems in the APS-U storage ring, with a focus on beam position monitors. Additionally, we will discuss various beam measurements, including beam current and lifetime, tune, beam stability, and swap-out injection bunch motion.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Weixing Cheng (2026) studied this question.

synapsesocial.com/papers/6971be8d642b1836717e33d4https://doi.org/10.18429/jacow-ibic2025-modi01
Ask AI
Helpful
Bookmark
Share
View Full Paper