PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
May 8, 2026Journal of Critical Infrastructure Policy0 citationsOpen Access

Emerging Risks and Housing Affordability Policy in Miami High‐Rises

View Full Paper
JBJean‐Pierre BardetJDJeffrey Dorfman

Key Points

  • The aim is to address long-term settlement issues in high-rise structures and improve regulatory processes.
  • Utilized satellite-based remote sensing and InSAR observations for performance measurement of high-rises
  • Analyzed geodetic data to understand settlement rates exceeding engineering expectations
  • Proposed a shift to performance-based regulations involving an expert panel.
  • Identified significant long-term settlement risks in high-rise towers that require regulatory reconsideration
  • Recommended a temporary moratorium on approvals for slender high-rise towers
  • Suggested enhanced oversight to shift financial and technical responsibility to developers.

Abstract

ABSTRACT Recent advances in satellite‐based remote sensing and building performance measurement have raised critical questions regarding the long‐term settlement behavior of high‐rise structures situated on the complex subsurface of southeastern Florida. Interferometric Synthetic Aperture Radar (InSAR) observations suggest that high‐rise towers may be experiencing long‐term settlement rates that exceed conventional engineering expectations. While these observations do not indicate imminent structural failure, they reveal a significant knowledge gap in predicting long‐term settlement of slender high‐rise towers. Simultaneously, post‐Surfside regulatory reforms have intensified financial burdens on condominium owners through enhanced reserve and inspection mandates. This paper argues that existing geodetic performance data for high‐rise building settlement justify a reconsideration of the current high‐rise permitting and oversight process. We propose a transition from entitlement‐based approvals to a performance‐based regulatory environment, supported by an independent expert panel to establish safety baselines. Central to our recommendations is a temporary approval moratorium on slender high‐rise towers. This pause would facilitate evidence‐based policy evolution, ensuring that developers assume financial and technical responsibility, appropriate to the level of risk, for long‐term geotechnical performance in an era of rapid urban intensification.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Bardet et al. (2026) studied this question.

synapsesocial.com/papers/69fd7e42bfa21ec5bbf06742https://doi.org/10.1002/jci3.70027
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1InSAR Observations of Construction‐Induced Coastal Subsidence on Miami's Barrier Islands, Florida2024 · 11 citations
  2. 2Creep, Ageing and Microstructural Change in Dense Granular Materials2003 · 122 citations
  3. 3Bridging the Gap: InSAR, Urban Subsidence, and the Imperative for Proactive Resilience in South Florida2025 · 1 citations
  4. 4Experimental Study of Drained Creep Behavior of Sand1998 · 136 citations
  5. 5InSAR analysis over the eastern coastline of Florida2024 · 2 citations