PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
January 20, 2026Integrated Environmental Assessment and Management0 citations

Short-term spatial dynamics of neotropical otter ( Lontra longicaudis annectens ) during hydroelectric dam construction in southern Mexico

View Full Paper
JRJenner Rodas-TrejoJMJosé Isaac Ramírez MacíasHGHéctor Hugo Barradas García

Key Points

  • The aim is to document the spatial dynamics of neotropical otters during hydroelectric dam construction in southern Mexico.
  • Conducted weekly surveys in two zones: Disturbed Zone and Riparian Zone.
  • Total of 104 surveys per zone from 2023 to 2024.
  • Used spatial analyses including Kernel density and Getis-Ord Gi* to assess activity hotspots.
  • Found higher habitat use indices in the Disturbed Zone (0.76 records/km) compared to the Riparian Zone (0.54 records/km).
  • Detected a 2.14 km southeast shift in activity hotspots toward the Riparian Zone in 2024.

Abstract

Abstract This study documented short-term spatial patterns of the neotropical river otter (Lontra longicaudis annectens) during hydroelectric dam construction in the Grijalva River, Chiapas, Mexico. Weekly systematic surveys were conducted in two zones during 2023–2024 (104 surveys per zone): a construction-Disturbed Zone and a less altered Riparian Zone. Methodological constraints—including absence of pre-construction baselines and a disturbance-gradient rather than control-impact design—limit causal inferences; findings represent preliminary observations temporally correlated with construction activities. Habitat use indices were higher in the Disturbed Zone (0.76 records/km) than the Riparian Zone (0.54 records/km). However, spatial analyses (Kernel density, Getis-Ord Gi*, Ripley’s K function) revealed a 2.14 km southeast shift in activity hotspots toward the Riparian Zone during 2024, consistent with potential displacement patterns as construction intensified. Results provide preliminary insights for hydroelectric project management, emphasizing the need for robust pre-construction baseline monitoring and connected riparian corridors to facilitate species movement.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Rodas-Trejo et al. (2026) studied this question.

synapsesocial.com/papers/696f1a469e64f732b51ee85ehttps://doi.org/10.1093/inteam/vjag009
Ask AI
Helpful
Bookmark
Share
View Full Paper