Deliverable 4.1 Demolition Methods Impacts

View Full Paper
ITInstituto Superior Técnico

Key Points

  • The research aims to assess current demolition practices in Europe and the feasibility of adopting selective demolition methods.
  • Conducted a multilingual survey using Microsoft Forms to gather data.
  • Survey disseminated over four months through outreach by project partners.
  • Collected 31 valid responses from diverse companies in construction and demolition sectors.
  • Assessed pre-demolition procedures, techniques, and attitudes towards selective demolition.
  • Visual inspection and hazardous-material identification are the most common pre-demolition practices.
  • Mechanical demolition is the predominant technique used, while manual methods are significant for specific structures.
  • About 70% of construction and demolition waste is reused or recycled, while 28% still goes to landfills.
  • Stronger incentives and regulations could increase the adoption of selective demolition practices.

Abstract

Please, note that this report has been submitted to the EC but its content has not been approved yet. Deliverable D4.1 of the DISCOVER project (HORIZON-CL4-2023-TWIN-TRANSITION 01-11-101129909) summarises the methodology and main findings of Task 4.1 of the DISCOVER project, which examines current demolition practices, the feasibility of selective demolition, and construction and demolition waste (C&DW) management across Europe. A multilingual survey was developed using Microsoft Forms to ensure accessibility, anonymity, and broad participation. Eight language versions were produced, and the survey was disseminated over four months through decentralised outreach by project partners, who shared it via institutional networks, email lists, and social media. This approach resulted in 31 valid responses from companies of varying sizes and operating profiles in construction, demolition, and C&DW processing. The survey assessed organisational characteristics, pre-demolition procedures, demolition techniques used in different structural contexts, and attitudes towards selective demolition. Results show that visual inspection and hazardous-material identification are the most frequently adopted pre-demolition actions, reflecting standard industry practice. Mechanical demolition using carriers emerged as the predominant technique across most building types, while manual demolition remains significant for masonry, timber, and mixed-material structures, supporting its role in selective dismantling. Abrasive and explosive techniques were reported as specialised methods applied only in specific reinforced-concrete or steel structures. Respondents indicated that selective demolition would be more widely adopted if supported by fiscal incentives, stricter landfill regulations, clearer technical guidelines, and stronger waste-processing networks. Waste-stream data revealed that approximately 70% of C&DW is currently reused or recycled, consistent with EU targets, although 28% still ends in landfill. These findings provide a foundational dataset for subsequent life-cycle and sustainability assessments within Work Package 4 and highlight both the sector’s willingness to embrace circular practices and the systemic barriers that hinder broader implementation.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Instituto Superior Técnico (2025) studied this question.

synapsesocial.com/papers/69746187bb9d90c67120b63ahttps://doi.org/10.5281/zenodo.18339267
Ask AI
Helpful
Bookmark
Share
View Full Paper