To investigate the bearing characteristics of super-long and large-diameter cast-in-place piles with combined pile-end and pile-side post-grouting, double-load-box self-balanced static-load tests were conducted on two such piles of the Yellow River Bridge Project on Jiaoping Expressway both before and after grouting. This study aims to provide technical insights for the design and construction of similar pile foundations. The test results indicate that, after grouting, the ultimate bearing capacities of test piles SZ1 and SZ2 increased by 123.1% and 72.8%, respectively, with a significant reduction in pile top settlement under the same load level. Under each load level, the axial force of the pile shaft reaches its maximum near the upper load box, presenting a triangular distribution curve. Furthermore, the side frictions of SZ1 and SZ2 enhanced by 87.73% and 83.59%, respectively, after grouting, while their ultimate end resistances are improved by 362.6% and 120.6%. These findings demonstrate that post-grouting effectively optimizes the mechanical properties of the pile–soil interface and enhances the structural stiffness of the surrounding soil. Specifically, the grout hardens at the pile end, solidifies the sediment there, increases the density of the pile-end soil layer, and improves the bearing rigidity of the bearing stratum. This research validates the effectiveness of the combined pile-end and pile-side post-grouting technology in improving the bearing performance of super-long and large-diameter cast-in-place piles, providing valuable technical support for the safe and efficient construction of the Yellow River Bridge on the Jiaoping Expressway and similar engineering projects.
Building similarity graph...
Analyzing shared references across papers
Loading...
Ruibao Jin
Siyu Pei
Qingwen Ma
Building similarity graph...
Analyzing shared references across papers
Loading...
Jin et al. (Sun,) studied this question.
www.synapsesocial.com/papers/6994055d4e9c9e835dfd63af — DOI: https://doi.org/10.3390/app16041947