Commissioning Results of Cryogenic Helium Plant for Korean Heavy Ion Accelerator After a Three-Year Overhaul

JYJunghyun YooJKJinwook KimIPI. Park

Key Points

  • This paper aims to evaluate the commissioning results of the SCL3 cryoplant after a major overhaul.
  • Conducted a refrigeration commissioning test to validate the operational performance.
  • Executed a three-year overhaul including parts replacement in compressors and pumps.
  • Inspected critical filters in the coldbox system.
  • Identified several minor issues during the commissioning test.
  • Demonstrated acceptable stability of the cryoplant post-overhaul.

Abstract

The Institute for Rare Isotope Science (IRIS) has two large-scale cryogenic helium plants (hereinafter referred to as”cryoplant”) for the Korean heavy ion accelerator. Each cryoplant is designed to perform 2.05 K operation of the superconducting linear accelerator (SCL). This paper focuses on the smaller unit, the SCL3 cryoplant, which provides simultaneous cooling capacity of 10,250 W at 45 K, 1040 W at 4.5 K and 910 W at 2.05 K. The SCL3 cryoplant was handed over from the manufacturer in August 2022, and has been operated by IRIS since then. A major overhaul was suggested over a three-year interval in preparation for long-term continuous operation so we executed the overhaul from October 2024 to March 2025. The overhaul included the replacement of consumable parts in the warm compressors and 2.05 K warm pumps as well as renewal of coalescing filters and activated carbon to eliminate residual oil from the compressed helium stream. On the coldbox side, critical filters such at the coldbox inlet and the turbine gas bearing inlet were also inspected. After the overhaul, a single refrigeration commissioning test was conducted to validate the mechanical integrity and operational performance. While several minor issues were identified during the test, the system demonstrated acceptable stability. This paper presents the commissioning procedure, observed minor problems, and evaluation of system performance, along with a brief overview of the overhaul activities.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Yoo et al. (2026) studied this question.

synapsesocial.com/papers/699a9cc6482488d673cd2742https://doi.org/10.1007/s10909-026-03389-5
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Current status of the RAON low-energy heavy ion accelerator2022 · 20 citations
  2. 2The TRIUMF-ISAC facility: two decades of discovery with rare isotope beams2016 · 44 citations
  3. 3SPIRAL at GANIL: Latest Results and Plans for the Future2007 · 15 citations
  4. 4Rare Isotope Production and Experimental Systems of RAON2016 · 11 citations
  5. 5Isotope harvesting at FRIB: additional opportunities for scientific discovery2019 · 58 citations