This research demonstrates robust scheduling advantages in efficiency amidst processing time uncertainties, indicating improved decision-making strategies.
Inconsistencies between key performance indicators (KPIs) and processing time uncertainties (PTUs) are two fundamental challenges to operations management in one-stage scheduling. Robust scheduling for the worst-case scenarios is recommended to hedge against PTU over optimal scheduling. Modern portfolio theory can be used to balance trade-offs between inconsistent KPIs, in terms of the expected cost E and variance σ2. We raise two research questions for trade-off balancing with PTU in one-stage scheduling. The first question (Q1) is whether an optimal scheduling method generates a solution better than a robust scheduling method, in terms of smaller average and maximum deviations from optimal solutions for individual KPIs, and the second one (Q2) is whether the suitable scheduling method generates a different solution space for efficiency in terms of E and σ. Revising trade-off balancing [ToB (α)] heuristics for optimal scheduling and comparing them with the end-point product (EP) and end-point sum (ES) heuristics for robust scheduling, we conclude that our revised ToB (α) heuristics are more robust to PTU and provide a different solution space of trade-off balancing for the efficiency.
No takes yet. Share an insight, caveat, or question.
Li et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: