This paper proposes a distributed gravity-assisted lifting system for pyramid construction integrating stepped terrace geometry, localized counterweight stations, and temporary V-channel granite insertion corridors. Mechanical force modeling and build-time simulation demonstrate feasibility within plausible Old Kingdom material constraints. The study establishes engineering plausibility and proposes experimental archaeology validation.
Joseph Battalia (Sat,) studied this question.