PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
March 25, 2026Buildings1 citationsOpen Access

Unlocking Success: Overcoming the Impact of Variation Orders on SMEs Using Modern Methods of Construction

View Full Paper
HMHafiz Muhammad MubasharAEAnushika EkanayakeDED.J. Edwards

Key Points

  • The research aims to identify key challenges faced by SMEs in the UK construction sector due to variation orders when using Modern Methods of Construction.
  • Conducted a comprehensive literature review to identify challenges related to variation orders.
  • Administered a questionnaire survey and conducted expert interviews.
  • Analyzed data thematically and statistically using SPSS software.
  • Validated findings through a detailed case study involving interviews and document analysis.
  • Identified three main clusters of challenges: operational issues, contractual issues, and module alteration-related issues.
  • Operational issues, especially cost discrepancies and client approval delays, significantly affect SMEs.
  • Highlighting the need for targeted mitigation strategies to enhance productivity and project performance.

Abstract

Construction project delays remain a persistent issue, often exacerbated by variation orders that adversely affect both financial and environmental performance, even in the UK. Although Modern Methods of Construction (MMC) have been increasingly employed to mitigate delays and improve efficiency, limited research has examined how variations affect small- and medium-sized enterprises (SMEs) adopting MMC in the UK construction sector. Given the pivotal role of SMEs and their financial vulnerability, this study examines the key challenges posed by variation orders for SMEs adopting MMC, with the broader aim of enhancing future project performance. Employing a two-stage iterative methodology, the research first identifies challenges through a comprehensive literature review, followed by a questionnaire survey and expert interviews. The resulting data were analysed thematically and statistically using SPSS and subsequently validated through a detailed case study involving interviews and document analysis. The findings highlight three principal clusters of challenges: operational, contractual, and module alteration-related, of which operational issues, particularly cost discrepancies, client approval delays, and rework, exert the most significant influence. The study provides a structured understanding of these interlinked challenges and underscores the need for targeted mitigation strategies to improve productivity and performance among UK construction SMEs engaged in MMC projects.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Mubashar et al. (2026) studied this question.

synapsesocial.com/papers/69c37b81b34aaaeb1a67e065https://doi.org/10.3390/buildings16061266
Ask AI
Helpful
Bookmark
Share
View Full Paper