Excavation adjacent to operating urban rail transit faces formidable deformation control challenges. To address this, a parametric collaborative optimization framework integrating micro steel pipe pile isolation and temporary intermediate partition wall reinforcement is proposed. Taking a foundation pit project at Shangdi Station of Beijing Metro Line 13 as a case study, a three-dimensional finite element model was established using the Hardening Soil constitutive model and calibrated with field monitoring data. Optimization analysis reveals that micro-pile spacing is the dominant factor controlling local rail settlement, while intermediate partition wall thickness primarily dictates global surface settlement. By balancing stringent safety limits with construction economy through a multi-objective evaluation, the preferred support configuration was calculated to be 273 mm diameter micro-piles at 500 mm spacing, combined with a 300 mm-thick partition wall. This collaborative configuration successfully truncates lateral soil displacement, reducing maximum rail settlement by over 55% and surface settlement by 53.6% compared to the baseline. Field monitoring results show high consistency with the numerical predictions (RMSE = 0.1438 mm), confirming the reliability of the proposed parametric collaborative optimization framework. Ultimately, this framework provides a validated, quantitative design methodology and a practical reference for support design in constrained excavations adjacent to existing sensitive infrastructure.
Building similarity graph...
Analyzing shared references across papers
Loading...
Haoyu Wang
Haoyu Wang
Anqi Zhang
Applied Sciences
Dalian University of Technology
Dalian Jiaotong University
China Railway Group (China)
Building similarity graph...
Analyzing shared references across papers
Loading...
Wang et al. (Wed,) studied this question.
www.synapsesocial.com/papers/69d896046c1944d70ce072dd — DOI: https://doi.org/10.3390/app16083631