The AMR comprised the observation by a competent archaeologist of all intrusive groundworks associated with the repairs to a drain and path, including the excavation of a 6-inch twin wall pipe under the path and the clearance of the ditch. In November 2025, Cotswold Archaeology carried out a programme of Archaeological Monitoring and Recording during groundworks associated with the replacement of a broken pipe at Glazier's Hollow, Delamere Forest, Cheshire. No features or deposits of archaeological interest were observed and no artefactual material was recovered.