PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
May 6, 2026Proceedings of the Institution of Mechanical Engineers Part C Journal of Mechanical Engineering Science0 citations

Underground coal-mine roadway boundary detection method based on 4D millimeter-wave radar

View Full Paper
DWDong WeiHWHouzhe WangXLXin Li

Key Points

  • To develop a reliable method for detecting underground roadway boundaries using 4D millimeter-wave radar.
  • Proposed a point-cloud dense reconstruction method based on spatiotemporal composite for 4D millimeter-wave radar.
  • Designed a method for extracting underground tunnel boundaries.
  • Established simulation and underground experimental platforms for testing.
  • Achieved maximum unilateral error of boundary extraction less than 0.1m.
  • Completeness and correctness rates of boundary detection greater than 95%.

Abstract

With the improvement of intelligence mine, underground operation robots are gradually being applied in underground operation areas to replace manual operations in complex coal mines. Due to the interference of uneven lighting, water mist, dust, and other environmental factors, it is difficult for the robots to identify the boundaries of underground roadways and achieve autonomous movement toward the target working area effectively. To solve the problem of identifying roadway boundaries in complex underground scenarios and provide necessary scene information for underground mobile equipment, a reliable detection method for underground roadway boundaries based on the 4D Millimeter-wave radar is proposed in this paper. While fully utilizing the insensitivity of 4D millimeter-wave radar to environmental factors such as lighting conditions, water mist, and dust, a point-cloud dense reconstruction method based on spatiotemporal composite is proposed for the 4D millimeter-wave radar, which solves the problem of sparse 4D millimeter-wave point clouds. Further, a method for extracting underground tunnel boundaries is designed to provide reliable scene information for the autonomous movement of underground mobile equipment. Finally, the simulation roadway experimental platform and underground experimental platform are established to conduct experimental research. The results show that the maximum unilateral error for extracting boundaries is less than 0.1m, and the completeness and correctness rate are greater than 95%.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Wei et al. (2026) studied this question.

synapsesocial.com/papers/69faa1eb04f884e66b532919https://doi.org/10.1177/09544062261440991
Ask AI
Helpful
Bookmark
Share
View Full Paper