Scan-to-BrIM Workflow for High-Detail Parametric Modelling of a Steel Pedestrian Structure from Point Clouds

View Full Paper
MPMassimiliano PEPEDPDonato PalumboAGAlfredo Restuccia Garofalo

Key Points

  • To develop a feasible workflow for high-detail modelling of a steel pedestrian bridge using point clouds.
  • Implemented a Scan-to-BrIM workflow for digital modelling of a pedestrian bridge.
  • Generated high-resolution point clouds with a rapid survey strategy.
  • Utilized a custom Python algorithm for parametric modelling and structural analysis.
  • Achieved a geometric RMSE of 2.5 mm during model construction.
  • Total processing time was 7.3 hours, demonstrating efficiency.
  • The parametric model maintained a geometric consistency of 5–10 mm with the original point cloud.

Abstract

This paper presents a computationally feasible/time-effective Scan-to-BrIM workflow for generating a highly detailed digital model of a complex steel pedestrian bridge. The proposed methodology integrates rapid and accurate point cloud acquisition with advanced parametric modelling and structural information management. First, a high-resolution point cloud is produced using a fast survey strategy that ensures the geometric precision required for a faithful representation of the existing structure. Second, the point cloud is processed in Rhinoceros/Grasshopper, where a custom Python (version 3.13) algorithm automatically detects and generates reference planes containing the structural components, enabling the creation of a consistent and fully parametric BrIM model. The latter approach includes metric normalization, voxel-based downsampling, reliable under tested conditions ground and outlier removal, and PCA (Principal Component Analysis)-based reorientation, followed by guided slicing of the point cloud and projection of each slice onto its section plane. The proposed workflow achieved a geometric RMSE of 2.5 mm with a total processing time of 7.3 h. The resulting parametric model achieves geometric consistency with the source point cloud within an operational tolerance range of approximately 5–10 mm, in line with the requirements of structural applications. Finally, the model is organised and managed within the BrIM environment and then transferred to a downstream FEM environment for preliminary structural application. The workflow is tested on a case study of a 40-m steel pedestrian bridge located in central Italy. Results demonstrate that the integrated approach provides a reproducible and semi-automated solution that reduces manual intervention in Scan-to-BrIM processes for producing accurate parametric models of steel pedestrian bridges, supporting structural assessment, asset management, and future maintenance strategies.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

PEPE et al. (2026) studied this question.

synapsesocial.com/papers/69fbf004164b5133a91a437chttps://doi.org/10.3390/buildings16091838
Ask AI
Helpful
Bookmark
Share
View Full Paper